China Best Supplier High Quality Beautiful Luxury Prefab Garden Studio 20ft 40ft Container House

Product Description

Prefab Home Overview
Prefab Home Layout
Prefab Home Finished Structure
Specifications
Item Specification Details
Prefab Homes Standard Prefabricated Structures
Steel Structure Prefab steel structure frame
Wall Panel 0.326 / 0.376 / 0.426 / 0.476 mm THC steel sheet
50 / 75 / 100 mm THC EPS / rock wool / glass wool / PU sandwich panel
Wall Color White grey and more (depending on quantity)
Roof 0.326 / 0.376 / 0.426 / 0.476 mm THC steel sheet
50 mm THC EPS / rock wool / glass wool / PU sandwich panel
Door 0.326 / 0.376 / 0.426 / 0.476 mm THC steel sheet
50 mm THC EPS / rock wool / glass wool / PU sandwich panel with lock
Window Aluminum PVC sliding door with security bar
Floor MGO / cement fiber floor board
Electricity Pre-wired with lighting and circuit distributor installed
Wind Resistance Grade 12 Wind speeds
Earthquake Resistance Grade 8
Snow Load Capacity of Roofing 0.6 kn/m²
Live Load Capacity of Roofing 0.6 kn/m²
Wall Permitted Loading 0.6 kn/m²
Structure Drawing
Base Frame Detail
Exploded view diagram
Production Display
Angle Head Detail

Angle head is used to connect and fix the whole frame

Support Columns

Columns are used to support the top weight

Wall Insulation

Wall panels provide acoustic, thermal, thermal and fire protection

Cement Fiberboard

Cement fibreboard for bottom reinforcement and load-bearing support

Finished Prefab Container Unit
Material Specifications & Options
Door Materials Options

Standard plastic steel doors, optional aluminum alloy, glass and other materials, and can be customized in size

Window Customization

Standard plastic steel window (single glass), optional aluminum alloy and double glass

Electrical Outlets Options

The socket can be customized according to customer requirements (US standards, European standards, British standards, German standards, etc.)

Toilet Fittings Layout

Container toilet (various styles, support size customisation)

Floor finishes

Floor PVC floor leather (a variety of styles available)

Color options

The appearance is standard white, and other colors are supported

Bedroom Interior Display
Installation Instructions
Base Frame Blueprint
Friendly Reminder

When installing, the weather should not be windy. It is best to install the steel base on the first day, and install the wall panels and roof on the second day. As soon as the wall panels start to be installed, the roof must be installed and fixed immediately, otherwise it will be easily blown away in strong wind.

Modular design and standardized components can be quickly assembled without complicated construction processes.

Step 1 Base Frame Assembly
Step 1

Fixed frame and bottom square tube with screws

Step 2 Wall Installation
Step 2

Installation of wall panels, doors and windows, fastening with screws and then sealing with glue

Step 3 Floor and Roof Assembly
Step 3

Installation of floor and top aircraft frame ceiling tiles, screwed and glued for sealing

Step 4 Completion
Step 4

Complete the installation

Outer Frame assembly display
Double floor structural design
Inner framework structure
Prefab home architectural render
Multi-room layout schematic plan
Multi-Scenario Applications
Modular housing site deployment

Multi-scenario applications: tourism accommodation, office space, earthquake relief, street flash mob, temporary dormitory and other multi-scenario applications.

Site Project 1
Site Project 2
Floor Layout plan
Site Project 3
Site Project 4
Site Project 5
Frequently Asked Questions
01. Are you a factory or trade?

We are a factory established in 2011, supporting OEM and ODM, providing customised design service.

02. What is your delivery time?

Depends on the order quantity, usually delivery within 5-15 days after the order is placed.

03. Do your products have a definite service life?

The service life of container house steel frame is 30 years under regular environmental conditions.

04. What is your supply capacity?

We can produce 1000 containers a day.

05. How long does it take to build a prefabricated house?

It depends on the size of the house. Usually, it takes about 3 hours for 2 workers to build a room.

06. Are prefabricated houses stable?

Even if there is a 200km/h hurricane and a magnitude 9 earthquake outside, you can still live in the light steel prefabricated house in complete safety.

Related Products