20FT Luxury Modern Prefab Modular Mobile Living Portable House Factory Price Movable Tiny Prefabricated Shipping Container Home

Customization: Available
After-sales Service: Online Technical Support
Application: Office

Product Description

Basic Info.
Model NO.
BPH5930
Fast Installation
Standard Installation
Feature
Earthquake Resistant, Easily Movable, Eco-Friendliness, Flexibly Combinable, Leak Proof, Moisture Proof, Safe, Thermal Insulation, Waterproof, Wind Resistance
Material
Sandwich Panel
Roof Structure
Corrugated Roof Tile + 50mm Glass Wool+ Steel Stri
Main Steel Structure
Cold Galvanized and Painting Treatment
Wall
EPS Sandwich Panel
Window
Aluminum Sliding Window Grill
Door
Steel Door
Accessories
Bolts, Screws, Nails
Keyword
Portal Modular Home for Office Building
Service Life
10-15 Years
Advantage
Easy Installation, Easy Transportation
Specification
5.95*3*2.8m
Origin
China
Packaging & Delivery
Package Size
600.00cm * 230.00cm * 120.00cm
Package Gross Weight
1100.000kg
Product Parameters
Product Parameters Banner
Specification Detail Dimension / Material Description
Size L5950 X W3000 X H2800 mm
Shipment 17units/40HQ
Wall EPS/Rockwool/Fiberglass wool/Rock wool/PU Sandwich Panel
Roof Roof tile+50mm glass wool+ steel sheet ceiling
Floor 18mm MGO Board/Fiber Cement Board with vinly flooring
Window Aluminum/PVC sliding window with grill
Door Single Steel door, or Roll-up/Double Sliding/Folding Glass Door
Assemble days 4 worker /6 units/day
Wind Load Anti 100KM/H
Floor Load 150 KG/m2
Roof load 50 KG/m2
Seismic Load 8 degree
Name 20FT Luxury Modern Prefab Modular Mobile Living Portable House Factory Price Movable Tiny Prefabricated Shipping Container Home
Product Description
Modular Mobile Living Portable House Design 1
Modular Mobile Living Portable House Design 2
Advantage Banner
Advantage
  • Detachable/Collapsible & Stackable container house
  • Low transportation cost & labor cost saving
  • Convenient moving, easy assemble and disassembly
  • Recyclable
  • Simple tools for erection, no need crane
Application
  • Low cost housing units, class room, dormitory
  • Office Building
  • Site office, worker camp
  • Garden house, shop
  • Modular hotel rooms, holiday house
Application Scenario Detail
Packaging & Shipping
Packaging & Shipping Banner
  • Steel structure knock down system: Weld and cut in the factory, only bolt connection on site.
  • Protection: Door and window panels are packed with foam and bubble paper.
  • Hardware storage: Hardware is put in a wooden case, carton, or plastic bag for each unit.
  • Professional packing: Easy and transportable packing layout helps reduce transportation and handling costs, minimizing goods damages in transit.
Packaging Method 1
Packaging Method 2
Packaging Method 3
Transit Layout 1
Transit Layout 2
On-site Assembly Process 1
On-site Assembly Process 2
Our Advantages
Factory Testing and Quality Control
Frequently Asked Questions
FAQ Banner
Q1: May I visit your factory?
A1: Yes, of course. You are welcome to visit our production facilities based in Guangdong, China. Please contact us in advance to schedule your visit.
Q2: What is your terms of payment?
A2: 30-50% TT for deposit, with the remaining balance due before shipping. We also accept 100% Irrevocable L/C at sight.
Q3: Can you supply the sample?
A3: Yes, we can supply samples of sandwich panels and various house parts. All sample express courier costs will be fully refunded after you place an official order.
Q4: Is the installation easy?
A4: Yes, our prefab houses are designed for easy installation and do not require on-site welding or extra processing. We provide comprehensive installation drawings and continuous online technical support.
Q5: Can you customize it for us?
A5: Absolutely. We have a professional team of engineers who will customize complete solutions tailored to your job site dimensions and specific requirements.
Q6: What is the delivery time?
A6: Generally, if the quantity is less than 3*40 HQ containers:
1. Portable cabins take approximately 30 days.
2. Detachable/Flat pack container houses take approximately 15 days.
3. Prefab worker accommodations take approximately 25 days.
4. Steel structure warehouses or workshops take approximately 35 days.
5. Sandwich panels take approximately 7 days.

Related Products